Foundation of the building complex Abrim Residences completed and the steel required for the mountings has already been delivered.

samra-bay-ii

samra-bay

Status of construction May 2009:

Pool area Ocean Breeze

blog-ocean-breeze-pool

View from the sea

blog-ocean-breeze